NivaarExam PrepOfficial exam papers ↗

23-Ind-A3 Facilities Planning: December 2014

Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)

  1. Question 1 Objectives of Facilities Planning, Material Handling Planning, and the Strategic Facilities Plan
  2. Question 2 Material Flow Planning, Activity Relationships, and Product Layout
  3. Question 3 Assembly Line Balancing (RPW Technique), Balance Delay, and Balancing-Technique Modifications
  4. Question 4 Production-Quantity Planning With Scrap and Rework, and Computerized Layout Programs
  5. Question 5 Manufacturing Cells, JIT/TQM/TEI Integration, Logistics Systems, and Flow Patterns
  6. Question 6 Unit Loads, Dock-Height Compensation, and Material Handling Equipment Characteristics
  7. Question 7 Materials Handling Concept, the Materials Handling Equation, and a Facilities-Design Improvement Study

Start with Question 1 →

Reference texts: Tompkins, White, Bozer & Tanchoco, Facilities Planning (4th ed., Wiley) — facilities design alternatives, material flow planning, activity relationships, machine space determination, material handling systems and the materials handling equation, computerized layout (CRAFT/CORELAP), and tool-crib centralization; Niebel & Freivalds, Niebel’s Methods, Standards, and Work Design (13th ed.) — assembly-line balancing (Ranked Positional Weight technique), balance delay, and production/scrap-allowance planning.