NivaarExam PrepOfficial exam papers ↗

24-MMP-A3 Mineral Processing: May 2018

Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)

  1. Question 1 Highland Valley Copper — Metallurgical Balance
  2. Question 2 Heavy-Liquid Density Mixing (TBE/CCl 4 )
  3. Question 3 Zircon-Concentrate Flowsheet from Oil-Sands Tailings
  4. Question 4 Mineral Processing Term Pairs
  5. Question 5 Copper Flotation Circuit — Rougher/Cleaner Mass Balance
  6. Question 6 Fill in the Blanks

Start with Question 1 →

EGBC National Exam — Mining and Mineral Processing Engineering, 09-MMP-A3 Mineral Processing, 2018-May. 3 hours duration, closed book; only an approved Casio or Sharp calculator permitted. Six questions constitute a complete exam paper (100 marks total).

Reference texts: Wills & Finch, Wills' Mineral Processing Technology, 8th ed. (metallurgical balances, recovery/enrichment ratio and separation efficiency – Ch. 1 & 12; comminution, crushers and mills – Ch. 6; gravity concentration – Ch. 10; magnetic and electrostatic separation, heavy-mineral-sand flowsheets – Ch. 13; froth flotation, cells and reagents – Ch. 12; classification, hydrocyclones and partition curves – Ch. 9; solid-liquid separation and tailings dams – Ch. 15 & 17); Taggart, Handbook of Mineral Dressing (heavy-liquid density calculations, classical two-product formulas).