NivaarExam PrepOfficial exam papers ↗

24-Pet-A5 Petroleum Production Operations: December 2014

Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)

  1. Question 1 Inflow Performance — Vogel and Fetkovich Methods
  2. Question 2 Flow Efficiency, AOF, and Hydraulic Fracturing Response
  3. Question 3 Continuous Gas Lift Design
  4. Question 4 Electrical Submersible Pump (ESP) Sizing
  5. Question 5 Standing's Method — Predicting Future IPR

Start with Question 1 →

National Exams December 2014 — 98-PET-A5 Petroleum Production Operations (3 hrs, open book). Reference texts: Golan & Whitson, Well Performance, 2nd ed.; Ahmed, Reservoir Engineering Handbook, 5th ed.; Brown, The Technology of Artificial Lift Methods, Vol. 2a–4; Beggs, Production Optimization Using Nodal Analysis, 2nd ed.; Craft & Hawkins, Applied Petroleum Reservoir Engineering, 3rd ed.