  1. Question 1 Rod-Pump Sizing — Straight-Line IPR
  2. Question 2 Vogel IPR and Standing's Flow-Efficiency Method — Hydraulic-Fracturing Evaluation
  3. Question 3 Nodal Analysis — Natural Flow Check and Gas-Lift Design
  4. Question 4 Gravel-Pack Completion — Producing Capacity
  5. Question 5 Electrical Submersible Pump — Required Horsepower

Start with Question 1 →

National Exams December 2018 — 17-PET-A5 Petroleum Production Operations (3 hrs, open book). Reference texts: Golan & Whitson, Well Performance, 2nd ed.; Ahmed, Reservoir Engineering Handbook, 5th ed.; Brown, The Technology of Artificial Lift Methods, Vol. 2a–4; Beggs, Production Optimization Using Nodal Analysis, 2nd ed.; Craft & Hawkins, Applied Petroleum Reservoir Engineering, 3rd ed.