Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)
Paper format: PEO / Engineers Canada National Examinations, December 2014, 07-Str-A3 Geotechnical Materials and Analysis. Three hours, closed book, drawing instruments required, one approved Casio or Sharp calculator. All charts and equations are supplied at the back of the paper (the m–n influence chart on page 8, a Newmark chart with $I_N = 0.005$ on page 9, and a two-page formula sheet). Total value 100 marks over six compulsory questions (20 + 10 + 10 + 20 + 20 + 20). Every question and every sub-part is answered in full below.
Reference texts: Das, Principles of Geotechnical Engineering, 9th ed. (Ch. 6 compaction, Ch. 7 permeability, Ch. 8 seepage and flow nets, Ch. 10 stresses in a soil mass, Ch. 11 consolidation, Ch. 12 shear strength); Knappett & Craig, Craig’s Soil Mechanics, 8th ed. (Ch. 2 seepage and flow-net construction, Ch. 5 shear strength, Ch. 11 lateral earth pressure); Holtz, Kovacs & Sheahan, An Introduction to Geotechnical Engineering, 2nd ed. (compacted-fill fabric and Proctor behaviour by USCS group); Harr, Groundwater and Seepage, Ch. 4 (closed-form conformal solutions for a single cut-off); Canadian Geotechnical Society, Canadian Foundation Engineering Manual (CFEM), 4th ed. — the governing Canadian practice document for earth pressures, seepage control and settlement; Canadian Dam Association, Dam Safety Guidelines (2013, rev. 2019); ASTM D698 / D1557 (Proctor compaction), ASTM D4767 (consolidated-undrained triaxial with pore-pressure measurement), ASTM D7181 (consolidated-drained triaxial).
Check — two printing slips in the source, carried exactly as printed. (1) The Question 1 header reads “(4 × 5 = 20 marks)” but five statements (i)–(v) are printed; this solution treats the question as 5 × 4 = 20 marks and answers all five parts. (2) Question 5(a) instructs the candidate to “draw on Figure 4”, while the only section supplied is labelled Figure 3 — the blank grid sheets on pages 6 and 7 are the intended drawing space. Neither slip changes the 100-mark total.