07-Str-B2: December 2017

Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)

  1. Question 1 Scheduling — precedence network, floats, critical path, delay impact and percent complete
  2. Question 2 Litigation — delay claims, contractual prevention, settlement routes and the analyses that support a claim
  3. Question 3 Estimating — duration and cost from R.S. Means production data, and the activity time–cost relationship
  4. Question 4 Engineering Economics — present-worth comparison of two projects with unequal lives
  5. Question 5 Insurance — bid bonds, performance bonds and payment retention, and the advantages of union resources
  6. Question 6 Safety Practices and Regulations — highway rehabilitation work zones, particularly at night

Start with Question 1 →

Paper format: National Exams, December 2017 — 07-Str-B2 Management of Construction. Three hours, closed book, one approved Casio or Sharp calculator permitted. Six questions of equal value (20 marks each); any five constitute a complete paper and only the first five answered in the answer book are marked. All six are worked below so that the paper can be used for revision whichever five a candidate chooses.

Reference texts: Hegazy, T., Computer-Based Construction Project Management (Prentice Hall) — precedence (activity-on-node) networks with lags, forward and backward passes, total and free float, earned-value progress measurement and the time–cost trade-off curve; these chapters carry Questions 1 and 3. Hendrickson, C. & Au, T., Project Management for Construction (2nd ed., Carnegie Mellon) — Chapter 5 (cost estimation and unit-cost data), Chapter 10 (fundamental scheduling procedures), Chapter 11 (advanced scheduling with lags) and Chapter 12 (cost control, monitoring and accounting), including percent-complete and earned-value reporting. Halpin, D.W. & Senior, B.A., Construction Management (4th ed., Wiley) — labour productivity, crew balance, construction contracts and bonding, and construction safety management. Peurifoy, R.L. & Schexnayder, C.J., Construction Planning, Equipment and Methods (9th ed., McGraw-Hill) — crew productivity and the physical determinants of daily output, behind Question 3. R.S. Means, Building Construction Cost Data (annual) — the structure of a unit-price line: crew, daily output, labour-hours per unit, bare material / labour / equipment, and total including overhead and profit. Sullivan, W.G., Wicks, E.M. & Koelling, C.P., Engineering Economy (17th ed., Pearson) — Chapters 5 and 6, present-worth analysis and the repeatability (common multiple of lives) assumption for alternatives with unequal lives, used in Question 4. AACE International, Recommended Practice 29R-03, Forensic Schedule Analysis, and the Society of Construction Law Delay and Disruption Protocol (2nd ed., 2017) — the delay-analysis taxonomy required by Question 2. Canadian Construction Documents Committee, CCDC 2 — Stipulated Price Contract (2020), CCDC 220 Bid Bond, CCDC 221 Performance Bond, CCDC 222 Labour and Material Payment Bond and CCDC 40 — Rules for Mediation and Arbitration, together with the BC Builders Lien Act holdback provisions — the Canadian contractual machinery behind Questions 2 and 5. Transportation Association of Canada, Manual of Uniform Traffic Control Devices for Canada (MUTCDC) and the BC Ministry of Transportation and Infrastructure Traffic Management Manual for Work on Roadways, with WorkSafeBC's Occupational Health and Safety Regulation (Part 18 Traffic Control, Part 4 lighting and workplace conditions, Part 8 personal protective clothing) — the Canadian rule set behind Question 6.

Check — what the printed R.S. Means line in Question 3 actually contains. On line 04810‑3000 the printed cells are labour-hours 0.092, bare material $3.62, bare labour $2.93, bare total $6.55 and total including O&P $8.45. The CREW, DAILY OUTPUT, UNIT and EQUIPMENT cells are blank on the paper — they are not faint, they carry no ink at all. The self-consistency of the printed row ($3.62 + $2.93 = $6.55) confirms the money columns were read correctly.