16-Civ-B8 Management of Construction: December 2013

Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)

  1. Question 1 Scheduling — CPM Analysis and the Two-Excavator Limit
  2. Question 2 Litigation — Delay, Rework, Claim Settlement and Delay Analysis
  3. Question 3 Engineering Economics — Comparing Two Projects of Unequal Life
  4. Question 4 Estimating and Bidding — Unit-Price Estimate with Local Labour Rates
  5. Question 5 Project Control — The S-Curve and the Earned Value Method
  6. Question 6 Safety Practices and Regulations — Night Work in Bridge Rehabilitation Zones

Start with Question 1 →

Paper format. National Exams, December 2013 — 98-Civ-B8 Management of Construction (the paper now catalogued as 16-Civ-B8). Three hours, closed book; one of two approved calculator models permitted. Six questions of equal value (20 marks each); the rubric states that any five constitute a complete paper and that only the first five presented in the answer book will be marked. All six are worked here, because this set is a study resource rather than an exam script. The paper splits three calculative questions (scheduling, engineering economics, estimating) against three descriptive ones (claims, project control, safety).