Paper format. National Exams, May 2014 — 98-Civ-B8 Management of Construction (the paper now catalogued as 16-Civ-B8). Three hours, closed book; one of two approved calculator models permitted. Six questions of equal value (20 marks each); the rubric states that any five constitute a complete paper and that only the first five presented in the answer book will be marked. All six are worked here, because this set is a study resource rather than an exam script.
Reference texts.
- Halpin, D. W. and Senior, B. A., Construction Management, 4th ed., Wiley — unit-price estimating and crew productivity, precedence diagramming with lags, labour relations, project control.
- Hendrickson, C. and Au, T., Project Management for Construction, 2nd ed. — Ch. 5 (cost estimation from productivity data), Ch. 10 (scheduling with activity relationships and resource constraints).
- Project Management Institute, A Guide to the Project Management Body of Knowledge (PMBOK Guide) — §6.5 Develop Schedule (leads, lags, critical path, float), §7 Cost Management.
- RSMeans, Building Construction Cost Data — front matter on crew tables, daily output, labour-hours per unit and the overhead-and-profit columns.
- Fraser, N. M. et al., Global Engineering Economics: Financial Decision Making for Engineers, Canadian ed., Pearson — Ch. 3–4 (present worth, uniform series, deferred annuities).
- Canadian Construction Documents Committee, CCDC 2 — Stipulated Price Contract (2020) — GC 6.5 delays and extensions of time; and Society of Construction Law, Delay and Disruption Protocol, 2nd ed. — concurrency, time-slice and as-built but-for analysis.
- Hinze, J. W., Construction Safety, 2nd ed.; WorkSafeBC, Occupational Health and Safety Regulation (Parts 4, 8, 11, 18, 20) and the BC Ministry of Transportation Traffic Management Manual for Work on Roadways.