Question 7 of 7: Accident Case Analysis — Die-Rigging Keeper-Pin Shear
Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)
Notes on this paper
National Exams — May 2016 — 11-CS-2 Engineering in Society: Health and Safety. Closed book; approved calculator permitted. Any five of the seven questions constitute a complete paper; all questions are of equal value. Answers are written in point form but fully, as instructed. Complete answers to all seven questions follow.
Immediate cause — the chain was rigged against the keeper pin instead of the rated die notch/lifting point; taking up the slack sheared the pin, which flew and struck the worker.
Root/contributing causes: improper rigging (load on a component not designed to bear it); no verification (the rigging was not double-checked); poor communication/coordination (lift signalled while the worker was not clear); the worker in the line of fire of the tensioned rigging; procedure/training gaps.
(ii) Corrective Actions
Safe rigging procedure — attach only to designated rated lifting points; use correctly rated slings/chains; verify before load is applied.
Independent check — a second person/supervisor verifies rigging before lifting ("no lift until checked").
Signalling protocol — one designated signaller; lift only on a clear signal after confirming everyone is clear.
Keep clear / line of fire; training in rigging, signalling and crane safety.
(iii) Follow-Up
Investigate and document (root-cause analysis); report as legally required.
Implement corrective actions; write/update the safe-rigging and signalling procedure; retrain riggers/operators; audit lifts.
Review similar operations plant-wide; monitor for recurrence; support the injured worker; share lessons learned.