18-Env-B5 Industrial & Hazardous Waste Management · December 2015

Question 17 of 18: Four Critical Components of a Hazardous Waste Plan

Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)

Notes on this paper

Reference texts: Nemerow & Dasgupta, Industrial and Hazardous Waste Treatment, 2nd ed.; Metcalf & Eddy, Wastewater Engineering: Treatment and Resource Recovery, 5th ed.; Davis & Cornwell, Introduction to Environmental Engineering, 6th ed.; LaGrega, Buckingham & Evans, Hazardous Waste Management, 2nd ed.; CCME, Guidelines for the Management of Biomedical Waste in Canada (1992); Canadian Environmental Protection Act (CEPA), 1999; Basel Convention on the Control of Transboundary Movements of Hazardous Wastes (1989); provincial hazardous waste regulations (e.g. BC's Environmental Management Act and Hazardous Waste Regulation).

Question 17: Four Critical Components of a Hazardous Waste Plan (4 marks)

Question text not reproduced: the examination questions are © Engineers and Geoscientists BC. Open the official past paper (linked at the top of this page) to read the question, then follow the worked solution below.

(1) Waste identification and minimization program — characterizing every hazardous waste stream generated and a documented plan to reduce the quantity/toxicity generated at the source. (2) Storage and handling procedures — labelled, compatible, secondary-contained storage areas with defined maximum accumulation times, satisfying container and segregation (incompatible-materials) requirements. (3) Emergency contingency plan — documented spill, fire and explosion response procedures, including notification protocols, spill containment equipment, and coordination with local emergency responders. (4) Training and recordkeeping/manifest system — personnel trained in safe handling and emergency response, with a cradle-to-grave manifest tracking every shipment from generation through final treatment or disposal.