18-Env-B6 Agricultural Waste Management · December 2019
Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)
National Exams, December 2019 — 18-Env-B6, Agricultural Waste Management (3 hours, open book, all 15 questions to be attempted, 100 marks total).
Reference texts: Rynk et al., On-Farm Composting Handbook (NRAES-54); OMAFRA, Nutrient Management Act, 2002 and O. Reg. 267/03 / Nutrient Management Protocol (NMAN); Metcalf & Eddy, Wastewater Engineering (anaerobic digestion chapter); ASABE Standards (manure storage, land application equipment); Environment and Climate Change Canada / Canada–Ontario Lake Erie Action Plan.
Question text not reproduced: the examination questions are © Engineers and Geoscientists BC. Open the official past paper (linked at the top of this page) to read the question, then follow the worked solution below.
An outdoor concrete manure storage pad is exposed to direct precipitation, and rain or snowmelt contacting the pile picks up leachate (highly concentrated soluble nutrients and organics) that must be prevented from reaching surface water or groundwater. Three distinct engineering approaches address this:
1. Roof the storage pad. A permanent roof structure over the pad eliminates precipitation contact with the manure entirely, which is the most complete solution — no contaminated runoff is generated in the first place because there is no water reaching the pile. This adds a capital cost (structure, larger footprint for equipment access) but removes the ongoing need for a leachate collection/treatment system.
2. Perimeter curbing with leachate collection to a liquid storage. Where the pad is left uncovered, a raised curb around the pad perimeter (sloped to a low-point collection point/sump) captures both direct precipitation and manure leachate rather than allowing it to sheet off onto surrounding land, and routes it by gravity or a small lift pump to the farm's existing liquid manure storage (or a dedicated leachate holding tank) for eventual land application under the same Nutrient Management Plan. This treats the collected liquid as a nutrient resource rather than a waste to be discharged.
3. Vegetated treatment/filter strip on the pad's clean-water diversion path. Combined with curbing, a diversion berm or eavestrough that routes CLEAN roof/upslope water AROUND the pad (rather than across it) minimizes the volume of water that becomes contaminated in the first place; any residual contaminated runoff that does leave a controlled discharge point is then passed through a properly sized vegetated filter strip, which provides settling and biological/soil uptake of the remaining nutrients before the water reaches a watercourse or tile inlet.
All three measures follow the same underlying principle — minimize water contact with the manure, then capture and treat/reuse whatever contact still occurs — and a well-designed facility typically layers more than one (e.g., curbing plus a filter strip) rather than relying on a single measure.