Question 5 of 5: RQD, RMR and stand-up time for a tunnel
Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)
Notes on this paper
National Exams, December 2015 — 04-Geol-A5, Rock Mechanics. Open-book, 3-hour
exam; 5 questions of 20 marks each; candidates were instructed to answer only 4 of the 5 — all 5 are answered below as a complete study resource.
Reference texts for this subject:
Bieniawski, Z.T. (1989), Engineering Rock Mass Classifications, Wiley.
Hoek, E. (2007), Practical Rock Engineering, Rocscience (open-access course notes).
Brady, B.H.G. & Brown, E.T., Rock Mechanics for Underground Mining, 3rd ed.
Wyllie, D.C. & Mah, C.W., Rock Slope Engineering, 5th ed.
Barton, N., Lien, R. & Lunde, J. (1974), “Engineering Classification of Rock Masses for
the Design of Tunnel Support” (the NGI Q-system).
Question 5: RQD, RMR and stand-up time for a tunnel (20 marks)
parallel to axis, dip 13°, spacing 1.4 m, slightly rough/weathered,
continuous, separation 1.0–1.3 mm
Joint #2
45° to axis, dip 20°, spacing 0.3 m, very rough, discontinuous,
separation <<0.1 mm
Groundwater
minimal, <5 L/min at low pressure
[Figure not reproduced: Core recovery box, 6 runs of 0.5 m each, 3.0 m total. See the official exam paper or the cited reference text.]
Figure Q5. Core recovery log as printed on the exam (columns 1–6 = successive 0.5 m runs, 3.0 m of core total). Natural fracture breaks are the diagonal double-line marks; hatched zones are recovered intact core.
Find. (a) RQD; (b) RMR; (c) limiting (max/min) unsupported span; (d) stand-up
time over that span range and the reinforcement needed.
Approach. Measure intact-piece lengths directly off the core-recovery log for
RQD, calibrate the point-load index against the five paired UCS readings to get a characteristic
intact strength, rate the remaining five RMR parameters from the joint data, then read the maximum
span/stand-up time and support schedule straight from the exam's own Table 1D/Table 2, with the
minimum practical span set by the closer joint spacing.
Part (a) — RQD from the core log. Reading intact-piece lengths off Figure
Q5 against its printed metre grid (natural fracture breaks are the diagonal double-line marks) and
keeping only pieces ≥0.10 m per run: run 1 → 0.17 m; run 2 → 0.14+0.15+0.19 = 0.48 m;
run 3 → 0.21 m; run 4 → 0.10 m; run 5 → 0.25+0.13 = 0.38 m; run 6 →
0.11+0.10+0.13 = 0.34 m; summing over the full 3.0 m recovered:
$$RQD=\frac{0.17+0.48+0.21+0.10+0.38+0.34}{3.0}\times100=\frac{1.68}{3.0}\times100$$
$$\boxed{RQD = 56\%\ \text{(Fair, 50-75\% band, RQD rating}=13\text{)}}$$
Check: piece boundaries were read from the printed core-recovery sketch against its 0.05 m grid (reading tolerance ±0.02–0.03 m per break); the result
is reported to the nearest whole percent and sits solidly inside the 50–75% band even allowing
for that reading tolerance.
As a cross-check, the volumetric joint count from the two MAPPED joint sets alone gives
Jv=1/1.4+1/0.3=4.05 m−1, RQD=115−3.3Jv≈102%
(capped at 100%) — notably higher than the 56% actually measured on the core. This is a real,
worth-noting discrepancy rather than an error: the volumetric-joint-count formula only "sees" the
two mapped geological joint sets, whereas the physical core additionally breaks along
mechanically-induced fractures from drilling and handling, so the directly measured RQD is used for
part (b), not the joint-based cross-check.
Part (b) — Calibrate intact strength from the point-load data. Fitting
Sc=k·Is50 through the origin by least squares to the five paired
readings (rather than assuming the exam's rounded k=24 factor) gives k=22.4; applying this factor to
the 10 additional Is50-only readings and averaging all 15 implied UCS values gives a
characteristic intact strength of
$$\sigma_c \approx 210.5\ \text{MPa}$$
Reading Figure 1's rating-vs-UCS curve at 210.5 MPa (interpolating between the plotted 200 MPa and
240 MPa points) gives a strength rating of 14.6. The RQD rating is 13 (part a). Discontinuity
spacing is governed by the closer-spaced Joint #2 (0.3 m, the 200–600 mm band), rating 10.
Condition of discontinuities is scored per joint set from Table 1 Section E and the WORSE (governing)
set used: Joint #1 (persistent bedding-like joint, separation 1.0–1.3 mm, slightly rough,
slightly weathered) scores 0+1+3+6+5=15; Joint #2 (discontinuous, essentially closed, very rough,
unweathered) scores a near-perfect 30; the governing value is Joint #1's 15. Groundwater at <10
L/min is a rating of 10 (not the “completely dry” 15). Both joints dip shallowly
(13° and 20°, both ≤20°), which Table 1's Section F places in the “dip
0–20°, irrespective of strike” row — Fair — giving an orientation
adjustment of −5 for a tunnel.
$$RMR = 14.6+13+10+15+10-5 = 57.6 \approx 58$$
$$\boxed{RMR = 58\ \text{(Class III, Fair rock)}}$$
Part (c) — Limiting excavation dimensions. Table 1D's own tabulated
anchor point for a Class III (Fair) rock mass is a maximum unsupported span of 5 m (average
stand-up time 1 week), so this is taken directly as the maximum practical span.
For the minimum practical span, a standard rule of thumb requires the unsupported
opening to be at least about 10× the closest discontinuity spacing so that the excavation is
not simply undercutting individual joint-bounded blocks; with Joint #2 at 0.3 m spacing,
$$\text{min span}=10\times0.3=3.0\ \text{m}$$
$$\boxed{\text{span range} \approx 3.0\text{-}5.0\ \text{m}}$$
Check: the minimum-span figure is an engineering-judgment rule of thumb (block
size vs. opening size), not a tabulated exam value; Table 1D itself only anchors the maximum-span
end of this range.
Part (d) — Stand-up time and reinforcement. At the maximum 5 m span,
Table 1D's Class III anchor gives an average unsupported stand-up time of about
1 week. Reducing the span toward the 3.0 m minimum lengthens the achievable
stand-up time substantially — the Modified Lauffer diagram (Figure 5) places the RMR≈58
boundary, at spans in the 3–5 m range, in the roughly one-month-to-several-months band, i.e.
on the order of 10× longer than at 5 m — though this is read as an order-of-magnitude
trend from the chart, not a precise value. Over this whole span range, Table 2's Class III (RMR
41–60) row specifies: top heading and bench excavation, 1.5–3 m advance in the top
heading, support commenced after every blast and completed within 10 m of the face; systematic rock
bolts 4 m long, spaced 1.5–2 m in the crown and walls, with wire mesh in the crown; shotcrete
50–100 mm in the crown and 30 mm in the sides; no steel sets required.
$$\boxed{\text{5 m span: support within days; 3 m span: support may be deferred several weeks, but Table 2's Class III schedule governs regardless}}$$
Final results — Question 5
RQD
56% (Fair, rating 13)
Characteristic UCS (point-load calibrated)
210.5 MPa
RMR
58 (Class III, Fair rock)
Max. unsupported span
5.0 m (1 week stand-up)
Min. practical span
3.0 m (10× closest joint spacing)
Support (Table 2, Class III)
4 m bolts @ 1.5–2 m, wire mesh, 50–100 mm
crown / 30 mm side shotcrete