NivaarExam PrepOfficial exam papers ↗

18-Geom-B6 Land Use Planning and Environmental Management · December 2013

Question 1 of 7: Definitions of Ten Land-Development Terms

Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)

Notes on this paper

National Exams, December 2013 — 04-Geom-B6, Land Use, Planning & Environmental Management. Three-hour closed-book technical session. Format: seven questions of equal value (20 marks each); the paper directs that answering any five (5) of the seven constitutes a complete exam (100%), and the first five as they appear in the answer book are marked. All seven questions are solved in full below so the set serves as a complete study resource. Content is framed in the Canadian planning context (the Canadian Institute of Planners definition of planning; provincial planning legislation and official community plans; the British Columbia Protected Areas Strategy; the federal/provincial environmental-assessment regimes and the CSA/CCME contaminated-sites framework), consistent with the Engineers Canada / EGBC syllabus for this exam code.

Reference texts: G. Hodge & D. Gordon, Planning Canadian Communities: An Introduction to the Principles, Practice and Participants (Nelson, current ed.) — the standard Canadian reference for this exam code; Canadian Institute of Planners (CIP) definition and code-of-professional-conduct materials; World Commission on Environment and Development, Our Common Future (the Brundtland Report, 1987); ISO 14001, Environmental Management Systems — Requirements; CSA Z768, Phase I Environmental Site Assessment, and CSA Z769, Phase II ESA; Canadian Council of Ministers of the Environment (CCME) contaminated-sites guidance; the Impact Assessment Act (S.C. 2019) and provincial EA statutes; British Columbia Protected Areas Strategy (1993) and provincial planning statutes (e.g., BC Local Government Act; Ontario Planning Act, R.S.O. 1990, c. P.13).

Question 1: Definitions of Ten Land-Development Terms (20 marks — 2 marks each)

Question text not reproduced: the examination questions are © Engineers and Geoscientists BC. Open the official past paper (linked at the top of this page) to read the question, then follow the worked solution below.

“Land use planning” (Canadian Institute of Planners). CIP defines planning as the scientific, aesthetic and orderly disposition of land, resources, facilities and services with a view to securing the physical, economic and social efficiency, health and well-being of urban and rural communities. Land-use planning is the application of that definition to the arrangement and regulation of land uses so as to serve the long-term public interest rather than the interest of any single owner.

Environmental management system (EMS). A structured, documented framework by which an organization identifies its environmental aspects and impacts, sets objectives and targets, assigns responsibility, and continually improves its environmental performance through a plan–do–check–act cycle. The recognized standard is ISO 14001; in a land-development setting an EMS governs how a project’s environmental commitments (erosion control, spill response, monitoring) are implemented and audited.

Zoning by-law. The legal instrument, enacted by a municipal council, that divides the municipality into districts (zones) and prescribes for each the permitted uses and the dimensional standards — height, density, setbacks, lot coverage and parking. Zoning is the principal regulatory tool that translates the policy of the official community plan into enforceable, parcel-by-parcel controls.

Total developable area. The portion of a site that can actually be built on after all undevelopable or constrained land is removed — that is, the gross site area less environmentally protected lands (wetlands, watercourses and their buffers, steep or unstable slopes, floodplain, right-of-way and easement encumbrances). It is the net land base used to compute realistic yield (lots or units) and to size servicing.

Watershed plans. Land- and water-management plans prepared at the scale of a drainage basin (the land that drains to a common watercourse). Because runoff, sediment and contaminants move across property and municipal lines within a basin, a watershed plan sets objectives for water quality, quantity (flood and low-flow), and aquatic habitat, and directs how land use, stormwater and riparian areas are to be managed so that cumulative effects on the receiving water are controlled.

Wellhead protection areas. Delineated land areas surrounding a public supply well (or well field) within which land uses are restricted to protect the aquifer from contamination. The boundary is drawn from the well’s capture zone / time-of-travel to the well, and activities that could introduce contaminants (fuel storage, certain industries, intensive agriculture, on-site sewage) are prohibited or tightly conditioned. It is a source-water-protection tool that links hydrogeology to land-use regulation.

Environmental assessment (EA). A systematic, forward-looking process that predicts the environmental effects of a proposed project or undertaking before it is approved, so that adverse effects can be avoided, mitigated or weighed in the decision. In Canada it is carried out under the federal Impact Assessment Act or the equivalent provincial statute, and typically includes scoping, effects prediction, mitigation, significance determination, public participation and follow-up.

Spatial planning. Public-sector coordination of the spatial distribution of activities and land uses across a territory, integrating sectoral policies (transportation, housing, environment, infrastructure) at the regional or provincial scale. It is broader than local land-use regulation: it steers where growth and investment go across many jurisdictions rather than regulating individual parcels.

Comprehensive community planning (CCP). A holistic, long-range and community-led planning process — widely used by First Nations and small communities — that addresses all dimensions of a community together (land and resources, governance, health, culture, economy, infrastructure) rather than a single sector. It is built on broad community engagement and produces a shared vision with priorities and an implementation path.

Site alteration. The physical disturbance of land — placing or removing fill, grading, or altering drainage — other than the erection of a building. Municipalities regulate site alteration by by-law (fill and topsoil-preservation by-laws) because uncontrolled cut, fill and regrading can cause erosion, sedimentation, drainage and slope-stability problems even where no building is proposed.