Paper format. National Examination, 07-Mec-A4 Design and Manufacture of Machine Elements, December 2013 — 3 hours, open book, any non-communicating calculator permitted. Eight questions on six pages, divided into Part A (manufacturing processes, Q1–Q4) and Part B (machine-element design, Q5–Q8). The rubric asks for three questions from Part A and two from Part B, five questions constituting a complete paper, all of equal value (20 % each). All eight questions are solved here.
Reference texts.
- Kalpakjian & Schmid, Manufacturing Engineering and Technology, 7th ed. — sand casting and casting defects (Ch. 10–12), adhesive bonding and joint design (Ch. 32), fusion welding and weld defects (Ch. 30–31), sheet-metal shearing and blanking (Ch. 16).
- Budynas & Nisbett, Shigley's Mechanical Engineering Design, 10th/11th ed. — eccentrically loaded shear joints (Ch. 8–9), combined stresses and stress transformation (Ch. 3), statically indeterminate shafts and deflection (Ch. 4), brakes and clutches (Ch. 16).
- Hibbeler, Mechanics of Materials, 10th ed. — transverse shear (\(VQ/Ib\)), combined loading and Mohr's circle (Ch. 7–9).
- Faires, Design of Machine Elements, 4th ed. — double-block (double-shoe) brakes, self-energizing geometry, equal-wear proportioning.
- ASM Handbook Vol. 15 Casting and Vol. 6 Welding, Brazing and Soldering — hot-spot/shrinkage defects; hydrogen-induced cold cracking and preheat practice (see also CSA W59 and CSA W47.1 for Canadian fabrication practice).
Check: Part B is figure-driven. Every dimension used below was read from the printed figures. Two readings are stated explicitly in Given so a grader can substitute a different interpretation without redoing the method: (i) in Figure A the low rivet is taken as lying on the same vertical centreline as the third rivet of the top row (75 + 75 = 150 mm from the left-hand rivet); (ii) in Figure D the dimension \(a\) is the horizontal spacing, measured along the operating lever, between the pin taking the upper shoe link and the pin taking the lower shoe link, with the 10 in operating arm measured from the lower-link pin.