NivaarExam PrepOfficial exam papers ↗

22-Mec-B3 Energy Conversion and Power Generation: May 2018

Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)

  1. Question 1 Gas Turbine
  2. Question 2 Combined Cycle Steam Turbine
  3. Question 3 Nuclear Plant Output
  4. Question 4 Condenser Performance
  5. Question 5 Hydro Power Plant
  6. Question 6 Coal Fired Boiler
  7. Question 7 Combined Cycle Comparison
  8. Question 8 System Load Demand

Start with Question 1 →

Paper format. 16-Mec-B3 Energy Conversion and Power Generation, National Examinations, May 2018. Three hours, closed book. Two sections: Section A is calculative (Questions 1–5) and Section B is descriptive (Questions 6–8). Candidates answer four questions from Section A and two from Section B; six questions of 10 marks each constitute a complete paper (60 marks). Reference data for individual questions are bound in as attachments on pages 9–15, reference formulae and constants on pages 16–19, and Granet & Bluestein steam tables are supplied. All eight questions are solved below, because the set is a study resource rather than a timed attempt.

Reference texts.

Wherever the paper's own attachments carry a value that duplicates a computed result — the Koeberg terminal temperature difference and back pressure on page 10, the gas-turbine output quoted in the preamble to Question 2, the published rating of the Oconee unit — that printed value is used as an independent check and the agreement is quoted in the answer.