Question 2 of 7: Break-Even Chart for the StaMCo Air Force Item

Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)

Notes on this paper

Paper format. 16-Mec-B4 Integrated Manufacturing Systems, National Exams December 2018 — a three-hour open-book examination; any non-communicating calculator is permitted. The cover page states that “Any five (5) questions constitute a complete paper” and that only the first five as they appear in the answer book will be marked, and that “All questions are of equal value”, so each of the seven printed questions is worth 20 marks against a 100-mark paper. Note 1 invites the candidate to submit a clear statement of any assumptions made where a question is open to interpretation — this paper needs that licence twice, and both places are flagged below in a Check box. Note 5 warns that some answers are wanted in essay form, where clarity and organisation carry marks. All seven questions are worked here, because the set is a study resource rather than a timed attempt.

Reference texts. D. C. Montgomery, Introduction to Statistical Quality Control, 8th ed. (Shewhart charts for the mean and the range, control-chart factors, process capability); A. J. Duncan, Quality Control and Industrial Statistics, 5th ed. (chart practice, natural tolerance versus specification, statistical tolerance intervals); E. S. Buffa and R. K. Sarin, Modern Production / Operations Management, 8th ed. (cost structures and break-even analysis, production planning and control, order types and dispatching); R. B. Chase, F. R. Jacobs and N. J. Aquilano, Operations and Supply Chain Management, 16th ed. (shop-floor control and the volume–process relationship); C. E. Ebeling, An Introduction to Reliability and Maintainability Engineering, 3rd ed. (series systems, exponential, normal and Weibull life models, safety margin and stress–strength interference); and M. P. Groover, Automation, Production Systems, and Computer-Integrated Manufacturing, 5th ed. (numerical control, and robot control resolution, accuracy and repeatability). Canadian practice follows the same texts: CSA and ISO 9001 quality-system requirements sit above the chart methods used here, and CSA Z434 governs the safeguarding of the industrial robots discussed in Question 7.

Question 2: Break-Even Chart for the StaMCo Air Force Item (20 marks)

Question text not reproduced: the examination questions are © Engineers and Geoscientists BC. Open the official past paper (linked at the top of this page) to read the question, then follow the worked solution below.

Given. A cost estimate for a special stamped item, quoted in the layered form that estimating departments use: a material charge, a labour content, two burden rates applied in sequence, and a target profit expressed on total cost.

Cost estimate as printed on the exam paper
ElementRate as quotedBehaviour
Material$0.50 per unitvariable
Tooling20 hoursfixed, one-time
Unit direct labour0.4 hour per unitvariable
Labour rate$2.00 per hour—
Factory burden115 per cent of labourfollows labour
General and administrative burden20 per cent of factory costfollows factory cost
Target profit10 per cent of total cost—
Basis (planned quantity)10,000 units—
Unit sales price$3.00—

Find. The break-even chart: the fixed-cost line, the total-cost line, the revenue line, the break-even quantity, and the position of the 10,000-unit basis on that chart, together with the price the target profit implies.

Check: the tooling charge. The estimate quotes tooling as “20 hours” rather than as a sum of money, so it is a labour charge of 20 × $2.00 = $40.00 incurred once, whatever the run length. The paper does not say whether factory burden is carried on those tooling hours. The reading taken here — and stated as an assumption under Note 1 — is that burden is carried on all factory labour, tooling included, since the burden rate exists precisely to recover plant overhead on labour hours. That makes the fixed cost $103.20. If tooling were instead treated as a direct charge outside the burden pool, the fixed cost would be $48.00 and the break-even quantity would move from 307 units to 143 units. Either reading leaves the conclusion untouched: the fixed cost is trivial beside the 10,000-unit revenue, and the venture breaks even in the first few hundred pieces.

Approach. Push a single unit and the one-time tooling charge through the identical burden chain — labour, then factory burden, then general and administrative burden — to obtain a variable cost per unit and a fixed cost. Those two numbers plus the price give the straight-line cost and revenue equations that the break-even chart plots.

  1. Cost one unit up to factory cost. Direct labour is the hours times the rate, and factory burden is applied to that labour: $$\text{unit direct labour} = 0.4 \times 2.00 = 0.80$$ $$\text{unit factory burden} = 1.15 \times 0.80 = 0.92$$ $$\text{unit factory cost} = 0.50 + 0.80 + 0.92 = 2.22 \text{ per unit}$$ all figures in dollars.
  2. Add the general and administrative burden. This second burden is struck on factory cost, not on labour, so it is applied to the whole 2.22: $$\text{unit G and A} = 0.20 \times 2.22 = 0.444, \qquad \text{unit total cost} = 2.22 + 0.444 = 2.664 \text{ per unit}$$ This 2.664 is the slope of the total-cost line on the chart.
  3. Cost the tooling through the same chain. The tooling hours are a one-time charge and therefore the whole of the fixed cost: $$\text{tooling labour} = 20 \times 2.00 = 40.00, \qquad \text{burden} = 1.15 \times 40.00 = 46.00$$ $$\text{tooling factory cost} = 86.00, \qquad \text{plus G and A} = 1.20 \times 86.00 = 103.20$$ $$\boxed{\;\text{fixed cost } F = 103.20, \qquad \text{variable cost } v = 2.664 \text{ per unit}\;}$$
  4. Write the two straight lines the chart plots. With $Q$ the number of units made and sold and a price of 3.00 each, $$\text{TC}(Q) = 103.20 + 2.664\,Q, \qquad \text{TR}(Q) = 3.000\,Q$$ The fixed-cost line is the horizontal at 103.20; the total-cost line starts there and rises at 2.664 per unit; the revenue line starts at the origin and rises at 3.000.
  5. Locate the break-even point. The contribution each unit makes toward the fixed cost is the price less the variable cost: $$c = 3.000 - 2.664 = 0.336 \text{ per unit}$$ $$Q_{\text{BE}} = \frac{F}{c} = \frac{103.20}{0.336} = 307.1 \approx 307 \text{ units}$$ $$\boxed{\;Q_{\text{BE}} = 307 \text{ units, or about } 921 \text{ in sales}\;}$$
  6. Place the 10,000-unit basis on the chart. Evaluating the same two lines at the planned quantity, $$\text{TC}(10{,}000) = 103.20 + 2.664(10{,}000) = 26{,}743.20$$ $$\text{TR}(10{,}000) = 3.000(10{,}000) = 30{,}000.00$$ $$\text{profit} = 30{,}000.00 - 26{,}743.20 = 3{,}256.80$$ which is 12.2 per cent of total cost. The margin of safety is $(10{,}000 - 307)/10{,}000 = 96.9$ per cent: sales could fall by nearly all of the planned volume before the job lost money.
  7. Check the price against the target profit. Costing the 10,000-unit run in the estimating department's own layered form gives factory cost $10{,}000(2.22) + 86.00 = 22{,}286.00$, G and A of $0.20(22{,}286.00) = 4{,}457.20$, and a total cost of $26{,}743.20$. The target profit is $$0.10 \times 26{,}743.20 = 2{,}674.32 \quad\Rightarrow\quad \text{target sales value} = 29{,}417.52, \quad \text{target unit price} = 2.942$$ $$\boxed{\;\text{target price } 2.94 \text{ per unit} \ < \ \text{actual price } 3.00 \text{ per unit}\;}$$

    so the quoted price clears the target profit with room to spare.

  8. Say at what volume the target profit is actually earned. The target is a moving one, because it is stated on cost rather than as a fixed sum. Setting profit equal to 10 per cent of total cost, $$3.000\,Q - (103.20 + 2.664\,Q) = 0.10\,(103.20 + 2.664\,Q)$$ $$0.0696\,Q = 113.52 \quad\Rightarrow\quad Q = 1{,}631 \text{ units}$$ Beyond about 1,631 units the item earns more than the 10 per cent target, and at the 10,000 basis it earns 12.2 per cent.
on the 10000 basis01000030000BEP 307target profit at 1631near the crossing020006000units produced and solddollars (CAD)sales revenuetotal costfixed cost (tooling)
Figure 2.1 — The break-even chart. Left, the full 10,000-unit basis, where the fixed cost is so small that the crossing is pressed against the origin and the profit wedge dominates. Right, the same chart zoomed to the first 2,000 units, where the break-even point at 307 units and the 1,631 units needed to earn the 10 per cent target profit can actually be read.
Question 2 — results (all money in dollars)
QuantityValue
Unit direct labour cost0.80
Unit factory burden0.92
Unit factory cost2.22
Unit general and administrative burden0.444
Unit total cost (slope of the cost line)2.664
Fixed cost from tooling (intercept of the cost line)103.20
Contribution per unit0.336
Break-even quantity307 units
Break-even sales value921
Total cost at the 10,000 basis26,743.20
Sales revenue at the 10,000 basis30,000.00
Profit at the 10,000 basis3,256.80, i.e. 12.2 per cent of cost
Margin of safety at the 10,000 basis96.9 per cent
Price implied by the 10 per cent target profit2.94 per unit
Volume at which the target profit is earned1,631 units