Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)
EGBC National Exam — Mining and Mineral Processing Engineering, 09-MMP-A4 Mine Valuation and Mineral Resource Estimation, 2018-May. 3 hours duration; closed book, with one handwritten 8.5×11 in. reference sheet (both sides) permitted; only an approved Sharp or Casio calculator allowed. Question 1 is compulsory (40 marks, parts 1.1–1.9); candidates then select THREE of the five optional Questions 2–6 (20 marks each) to complete the paper.
Reference texts: Isaaks & Srivastava, An Introduction to Applied Geostatistics (variogram modelling, kriging estimators); Hustrulid, Kuchta & Martin, Open Pit Mine Planning and Design (mine valuation, cut-off grade theory, incremental analysis); Gentry & O'Neil, Mine Investment Analysis (Canadian mining taxation, cash flow/risk, smelter contract terms, NSV/NSR); SME Mining Engineering Handbook, 3rd ed. (ore deposit models, mineral exploration/evaluation stages, equipment utilization); O'Hara, T.A., “Quick Guides to the Evaluation of Orebodies,” CIM Bulletin, Feb. 1980 (parametric capital-cost estimating); CIM Definition Standards for Mineral Resources and Mineral Reserves / National Instrument 43-101 (resource/reserve classification and reporting).