Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)
EGBC National Exam — Mining and Mineral Processing Engineering, 09-Mmp-A5 Surface Mining Methods and Design, 2013-May. 3 hours duration; one handwritten 8.5×11 in reference sheet permitted (not an open-book exam); only approved Sharp or Casio calculators allowed. Question 1 is compulsory (40 marks, parts 1.1–1.7); candidates then select FOUR of the six optional Questions 2–7 (15 marks each) to complete the paper.
Reference texts: Hartman & Mutmansky, SME Mining Engineering Handbook, 3rd ed. (dewatering, slope stability classification, dragline stripping geometry, truck dispatch, mine closure); Hustrulid, Kuchta & Martin, Open Pit Mine Planning and Design (moving-cone and Lerchs–Grossmann pit optimization, capital-cost estimating, truck-shovel match factor); Lerchs, H. & Grossmann, I.F. (1965) “Optimum Design of Open-Pit Mines,” CIM Bulletin (the graph-theoretic 2-D worked example this question is drawn from); O’Hara, T.A. (1980) “Quick Guides to the Evaluation of Orebodies,” CIM Bulletin, Feb. 1980, and Mular, A.L. & Poulin, R. (1998) CANCOST, CIM Special Volume 47 (capital-cost formulae); Bieniawski, Z.T. (1989) Engineering Rock Mass Classifications (RMR system).