23-Chem-A5 Chemical Plant Design and Economics · December 2018

Question 4 of 6: Top Six Technical Factors in Commercial-Plant Design

Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)

Notes on this paper

National Exams — December 2018 — 16-Chem-A5 Chemical Plant Design and Economics. Three-hour, closed-book exam; one two-sided aid sheet and an approved Sharp/Casio calculator permitted. Six equally weighted (20-mark) questions are posed and the candidate answers any five; only the first five are marked. All six are answered below for completeness. Question 1 is a process-synthesis flowsheet (catalytic propane dehydrogenation), Question 2 is a numerical discounted-cash-flow (DCFROR) minimum-selling-price calculation, and Questions 3–6 are qualitative design/economics essays (pilot-plant investigation, technical design factors, economic design factors, and a solvent-emission abatement scheme).

Reference texts: M.S. Peters, K.D. Timmerhaus & R.E. West, Plant Design and Economics for Chemical Engineers (5th ed., McGraw-Hill) — the exam's named primary text (pilot plants Ch. 3, general design considerations and plant-location factors Ch. 2–3, interest/depreciation/profitability Ch. 7–10); R.K. Sinnott & G. Towler, Chemical Engineering Design (Coulson & Richardson vol. 6) — economic analysis, cash-flow/DCFROR and flowsheeting; R. Smith, Chemical Process Design and Integration (2nd ed., Wiley) — reaction–separation–recycle structure; supporting Canadian practice from CCOHS, provincial OH&S regulation and Environment and Climate Change Canada air-emission guidance.

Question 4: Top Six Technical Factors in Commercial-Plant Design (20 marks)

Question text not reproduced: the examination questions are © Engineers and Geoscientists BC. Open the official past paper (linked at the top of this page) to read the question, then follow the worked solution below.

Given / Find. A qualitative question on plant-design methodology: identify and describe the six most important technical factors (as distinct from the economic factors of Question 5) that govern the design of a full-size commercial plant.

The technical design of a commercial plant translates a proven process into specified, buildable, operable and safe equipment. The six factors below are the technical decisions that most strongly shape the plant.

  1. Process route and flowsheet selection. The choice of chemistry, reactor type, and the reaction–separation–recycle structure fixes almost everything downstream. A good flowsheet maximises yield and selectivity, minimises the number and difficulty of separations, and defines the recycle and purge structure; it is the single most consequential technical decision.
  2. Material and energy balances and equipment sizing. Complete, converged mass and energy balances set every stream flow, composition, temperature and pressure, and from them the size and duty of each vessel, exchanger, pump and column. Errors here propagate through the entire design, so the balances must close before equipment is specified.
  3. Materials of construction. Each item must be built of a material that resists corrosion, erosion and the temperature/pressure service for an acceptable life. Correct selection (alloys, linings, non-metallics) governs reliability, maintenance and much of the capital cost; over-conservatism wastes money while under-specification causes failures.
  4. Energy integration and utilities. Heat integration (pinch analysis), heat-recovery networks and the supply of steam, cooling water, power and refrigeration determine the plant's operating cost and efficiency. Well-integrated designs recover process heat internally and size utility systems for both normal and turndown operation.
  5. Process control, instrumentation and safety. The plant must be controllable and safe across start-up, normal, turndown and upset conditions: control loops, alarms, interlocks, relief and venting, and hazard studies (HAZOP) are integral to the design, not an add-on. Under Canadian practice this includes provincial OH&S and CSA Z767 process-safety-management requirements.
  6. Plant location, layout and environmental compliance. Siting (feedstock, market, utilities, labour, transport) and physical layout (spacing for safety and maintenance, gravity flow, plot area) affect constructability and operability, while effluent, emission and waste treatment must meet environmental regulations — in Canada, Environment and Climate Change Canada and provincial permits.
Check: these six are the technical factors emphasised in Peters & Timmerhaus's general design considerations; the closely related economic factors (capital, product cost, profitability, market) are treated separately in Question 5, and safety/environmental compliance is folded into factors 5–6 here because the question asks specifically for technical factors.