Paper format. 98-Civ-B8 Management of Construction, National Exams
December 2016. Three hours, closed book, one approved calculator (Casio or Sharp). Six questions
of equal value (20 marks each); any five constitute a complete paper and only the first five
presented in the answer book are marked. All six are solved here, because the set
is a study resource rather than an examination script.
Reference texts.
- Halpin & Senior, Construction Management, 4th ed. — precedence networks with
lags, bonding, project control.
- Hendrickson, Project Management for Construction, 2nd ed. — scheduling, cost
control, earned value, financing of constructed facilities.
- Project Management Institute, A Guide to the Project Management Body of Knowledge
(PMBOK Guide), 6th ed. — schedule and cost management, earned value.
- Fraser et al., Global Engineering Economics, 5th Canadian ed. — present worth,
deferred annuities, maximum justifiable investment.
- Canadian Construction Documents Committee: CCDC 2 (stipulated price), CCDC 4 (unit price),
CCDC 14 (design-build), CCDC 3 (cost-plus), CCDC 23 Guide to Calling Bids and Awarding
Contracts; CCDC 220 / 221 / 222 bond forms.
- Builders Lien Act (British Columbia, RSBC 1997 c. 45) and the provincial
construction-lien / prompt-payment statutes; RSMeans Residential Square Foot Costs.