Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)
Paper format. National Exams, December 2013 — 07-Mec-B4, Integrated Manufacturing Systems. Three hours; open book; any non-communicating calculator permitted. Seven questions are printed and any five constitute a complete paper, each of equal value (20 marks); only the first five appearing in the answer book are marked. Several questions call for an essay answer, where clarity and organisation carry marks. Note 1 of the paper invites the candidate to state any assumption made where a question is open to interpretation — that licence is used twice below and each use is flagged. All seven questions are worked here, so the set can serve as a complete study resource.
Reference texts. Chase, Jacobs & Aquilano, Operations and Supply Chain Management (McGraw-Hill) — the source of this paper's forecasting, line-balancing, cost and quality material; Groover, Automation, Production Systems, and Computer-Integrated Manufacturing (Pearson) for process planning, cellular manufacturing, flexible manufacturing systems and plant networks; Montgomery, Introduction to Statistical Quality Control (Wiley) for the Shewhart chart constants and the normal-tail scrap calculations; Nahmias & Olsen, Production and Operations Analysis (Waveland) for the forecasting derivations; Kalpakjian & Schmid, Manufacturing Engineering and Technology (Pearson) for the ring-rolling and tolerance context. Canadian practice for the quality half of the paper follows CSA / ISO 9001 and the ISO 7870 series on control charts, which tabulate the same constants used below.