22-Mec-B4 Integrated Manufacturing Systems: May 2013

Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)

  1. Question 1 Components of Demand, Adaptive Forecasting and Econometric Forecasting
  2. Question 2 Priority Dispatching at a Work Centre
  3. Question 3 Categories of Forecasting Technique, and Method Selection from Data
  4. Question 4 Facility Location by Weighted Factor Rating
  5. Question 5 Workforce Sizing for a Fixed-Deadline Contract
  6. Question 6 Shewhart Control Charts and Their Power to Detect a Shift

Start with Question 1 →

Paper format. National Exams, May 2013 — 07-Mec-B4, Integrated Manufacturing Systems. Three hours; open book; any non-communicating calculator permitted. Six questions are printed and any five constitute a complete paper, each of equal value (20 marks); only the first five appearing in the answer book are marked. Several questions call for an essay answer, where clarity and organisation carry marks. Note 1 of the paper invites the candidate to state any assumption made where a question is open to interpretation — that licence is used twice below and each use is flagged. All six questions are worked here, so the set can serve as a complete study resource.

Reference texts. Chase, Jacobs & Aquilano, Operations and Supply Chain Management (McGraw-Hill) — the source of this paper's forecasting, scheduling, location and quality material; Groover, Automation, Production Systems, and Computer-Integrated Manufacturing (Pearson); Montgomery, Introduction to Statistical Quality Control (Wiley) for the Shewhart chart constants and operating characteristics; Nahmias & Olsen, Production and Operations Analysis (Waveland) for the forecasting derivations; Kalpakjian & Schmid, Manufacturing Engineering and Technology (Pearson) for the process context. Canadian practice for the quality half of the paper is CSA Q / ISO 9001 and the ISO 7870 series on control charts, which adopt the same constants tabulated below.