24-MMP-A4 Mine Valuation and Mineral Resource Estimation · December 2014

Question 24 of 27: NSV vs. NSR Definitions

Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)

Notes on this paper

EGBC National Exam — Mining and Mineral Processing Engineering, 09-Mmp-A4 Mine Valuation and Mineral Resource Estimation, 2014-Dec. 3 hours duration; one handwritten 8.5×11 in reference sheet permitted (not an open-book exam); only approved Sharp or Casio calculators allowed. Question 1 is compulsory (40 marks, parts 1.1–1.7); candidates then select FOUR of the six optional Questions 2–7 (15 marks each) to complete the paper.

Reference texts: Isaaks & Srivastava, An Introduction to Applied Geostatistics (variogram modelling, kriging estimators, volume–variance relations); Hustrulid, Kuchta & Martin, Open Pit Mine Planning and Design (mine valuation, NPV and cut-off grade methodology, mineable reserves); Gentry & O'Neil, Mine Investment Analysis (Canadian mining taxation, smelter/refining contract terms, net smelter return); SME Mining Engineering Handbook, 3rd ed. (mineral exploration/evaluation stages, ore reserve classification); CIM Best Practice Guidelines and NI 43-101 (Canadian Securities Administrators).

Question 6.2: NSV vs. NSR Definitions (2 marks)

Question text not reproduced: the examination questions are © Engineers and Geoscientists BC. Open the official past paper (linked at the top of this page) to read the question, then follow the worked solution below.

Net Smelter Value (NSV) is the gross value of the payable metal content of a shipment — payable metal quantity multiplied by the market price — before any treatment, refining or penalty deductions are subtracted. Net Smelter Return (NSR) is what the smelter actually pays the mine: NSV less treatment charges, refining charges, and any impurity/penalty deductions. NSR is therefore always less than or equal to NSV for the same shipment. Both are conventionally expressed as currency per dry metric tonne (DMT) of concentrate shipped, though either can equally be expressed per tonne of ore milled once concentrate grade and recovery are folded in.