NivaarExam PrepOfficial exam papers ↗

24-Pet-A5 Petroleum Production Operations: December 2019

Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)

  1. Question 1 Vogel and Fetkovich IPR — Single-Point and Four-Point Tests
  2. Question 2 Standing's Flow-Efficiency Method — Two-Point Test and Post-Frac Skin
  3. Question 3 Continuous Gas-Lift Design — Point of Injection and Injection Gas Rate
  4. Question 4 Electrical Submersible Pump — Required Horsepower
  5. Question 5 Standing's Method — Future IPR for a Weak Water-Drive Reservoir

Start with Question 1 →

National Exams December 2019 — 17-Pet-A5 Petroleum Production Operations (3 hrs, open book). Reference texts: Golan & Whitson, Well Performance, 2nd ed.; Ahmed, Reservoir Engineering Handbook, 5th ed.; Brown, The Technology of Artificial Lift Methods, Vol. 2a–4.

The source NOTES state that the first four questions as answered constitute a complete paper; every question (1–5) is fully solved below.