NivaarExam PrepOfficial exam papers ↗

22-Mec-B2 Environmental Control in Buildings: May 2017

Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)

  1. Question 1 Winter heating and humidifying plant — preheat, adiabatic spray, reheat
  2. Question 2 Summer cooling and dehumidifying plant — mixed state, coil duty, ADP and by-pass factor
  3. Question 3 Induced-draught counter-flow cooling tower
  4. Question 4 Two-stage ammonia plant with a flash chamber
  5. Question 5 Thermal comfort, chilled-water reset and campus cogeneration
  6. Question 6 U-factor of a 2 × 4 stud wall, and mould on an uninsulated solarium wall
  7. Question 7 Round duct sizing by the equal-friction method
  8. Question 8 Internal heat gains at 4 p.m., and seasonal gas use by the degree-day method

Start with Question 1 →

Paper format. Professional Engineers of Ontario / Engineers Canada annual examination 16-Mec-B2 Environmental Control in Buildings, May 2017, three hours, open book. Eight problems of 20 points each; candidates are required to solve five, and all questions carry the same value. ASHRAE psychrometric charts (SI and inch-pound) and an R-717 pressure–enthalpy diagram are appended to the paper. All eight problems are solved here.

Reference texts for this subject.

Conventions used throughout. Moist-air properties are computed from the ASHRAE Handbook — Fundamentals Ch. 1 formulation at a barometric pressure of 101.325 kPa, so that every state point can be checked against the charts appended to the paper. Enthalpy is referred to dry air at $0^{\circ}\text{C}$ and liquid water at $0^{\circ}\text{C}$, i.e. $h = 1.006\,t + W\,(2501 + 1.86\,t)$ in kJ per kilogram of dry air. Problems 3 and 6 to 8 are worked in the inch-pound units in which they are set, as the examination directs.