21-Mat-B1 Hydrometallurgy and Electrometallurgy · December 2014
Nivaar worked solution (AI-drafted; not reviewed by a licensed engineer)
Paper format. National Professional Examinations, December 2014 — 10-Met-B1, Mineral Processing. Three hours, closed book, approved Casio/Sharp calculator only. Six numbered Problems (all compulsory except Problem 5) plus a two-mark Bonus Question. Problem 5's rubric asks for any SIX of eleven sketch-and-describe topics; all eleven topics are answered below.
Nothing on the paper is a hydrometallurgy (leaching, solvent extraction, electrowinning) or electrometallurgy question; the syllabus actually examined is comminution and grinding-circuit mass balance, particle settling, flotation kinetics, and mineral-processing equipment/terminology — the physical/mechanical beneficiation stage that precedes hydro- or pyro-metallurgical extraction.
Reference texts. The answers below are keyed to the works normally recommended for this syllabus code:
Question text not reproduced: the examination questions are © Engineers and Geoscientists BC. Open the official past paper (linked at the top of this page) to read the question, then follow the worked solution below.
Around the exam date (December 2014), base-metal cash prices on the London Metal Exchange put several common metals below the USD 1.50/lb threshold, while copper (roughly USD 2.90/lb) and nickel (roughly USD 6.80/lb) were well above it.
| Metal | Approx. LME cash price, Dec 2014 |
|---|---|
| $\boxed{\text{Zinc}}$ | ≈ USD 0.95–1.00/lb |
| $\boxed{\text{Lead}}$ | ≈ USD 0.85–0.90/lb |
Aluminum (≈ USD 0.80–0.85/lb at the time) is a third valid answer.