Paper: Surface Mining Methods and Design (09-MMP-A5), National Exam, December 2018 — 20 pages, compulsory Question 1 (40 marks, parts 1.1–1.8) plus THREE of five optional Questions 2–6 (20 marks each) normally constitute a complete paper. As a study resource, this solution answers Question 1 in full AND all five optional Questions 2–6.

Reference texts: Hustrulid, Kuchta & Martin, Open Pit Mine Planning and Design (3rd ed.) — truck-shovel match factor, dragline stripping geometry, capital cost indexes, open-pit scheduling; SME Mining Engineering Handbook (3rd ed.) — equipment costing, mine dewatering, cost-index escalation.

Question 3.9 feasibility check (1 mark)

Question text not reproduced: the examination questions are © Engineers and Geoscientists BC. Open the official past paper (linked at the top of this page) to read the question, then follow the worked solution below.

Approach. Compare each computed requirement from 3.8 against the machine’s own rated capability from the Given specifications (Q3.4).

  1. Digging depth check. Required overburden cut depth 25 m vs. rated digging depth 35 m: $$25\text{ m} \le 35\text{ m} \;\Rightarrow\; \text{OK, 10 m margin}$$
  2. Stacking height check. Required operational stacking height 6.85 m (3.8.4) vs. rated stacking height 12 m: $$6.85\text{ m} \le 12\text{ m} \;\Rightarrow\; \text{OK, 5.15 m margin}$$
  3. Reach check. Required dumping reach for the spoil pile (75 m, Q3.4) is well within the 90 m operating radius, and the digging reach across the 40 m pit (well under the radius) is not limiting either.

$$\boxed{\text{Yes} \text{ — the dragline can complete this cut without modification}}$$ all three governing limits (digging depth, stacking height, reach) clear with comfortable margin under the stated specifications.

CheckRequiredRatedResult
Digging depth25 m35 mOK
Stacking height6.85 m12 mOK
Reach (stacking/dig)75 m / <55 m90 mOK
Check — this feasibility conclusion follows from the isosceles free-standing spoil-pile model stated in Question 3.8. A less favourable spoil geometry (e.g. one face vertical against prior spoil rather than at repose angle both sides) would give a taller, narrower pile and could erode or eliminate the stacking-height margin — worth re-checking once field survey confirms actual spoil-pile shape.